Projects

« back
Tunnel section under Alexander Malinov Blvd.

Tunnel section under Alexander Malinov Blvd.

Technical data: Length = two one-way tunnel pipes, each 395 m. long; Profile = 35 m2. each pipe.

Period:

Additional information: Metro tunnel – Tunnel section under Alexander Malinov Blvd., part of the First metro diameter, between Metro station 13 – Maldost I Qr. and Metro station 18.

Tunnel constructions – New Austrian Tunneling Method

Activities: Drilling and reinforcement, inner concrete.

Pictures From Gallery

all pictures »